Road Construction Update 1. In Creve Coeur, they've had barricades up since before Labor Day on Rt 29 down the hill to Wesley Road by the Bingo Center. Then they applied asphalt patches here and there, then removed SB barricades. Some storm drainage work was done next to the NB lanes.
When that was done last week, IDOT commenced a fast track chop up old concrete starting at LaGondola, all the way down to Wesley Road. Started on Monday, and by last night, already had 1 layer of asphalt on 3 of 4 lanes. Don't know what was being done this morning as I took alternate route for a doctor appointment.
2. Wife said any construction on I-155 and I-55 from Morton to Springfield was done.
3. Concrete piers and steel beams are up on IL 116 by Kickapoo Creek Road. Processing nicely.
4. I-474/74/It 6/War Memorial Drive ramps closing and opening constantly. Almost need to put on calendar because 1 week, ramps I use are closed, then opened, then closed again 2 weeks later. So I'm avoiding that area altogether. At least, Rt. 6 from Rt. 29 to Allen Rosd exit is all done.
When that was done last week, IDOT commenced a fast track chop up old concrete starting at LaGondola, all the way down to Wesley Road. Started on Monday, and by last night, already had 1 layer of asphalt on 3 of 4 lanes. Don't know what was being done this morning as I took alternate route for a doctor appointment.
2. Wife said any construction on I-155 and I-55 from Morton to Springfield was done.
3. Concrete piers and steel beams are up on IL 116 by Kickapoo Creek Road. Processing nicely.
4. I-474/74/It 6/War Memorial Drive ramps closing and opening constantly. Almost need to put on calendar because 1 week, ramps I use are closed, then opened, then closed again 2 weeks later. So I'm avoiding that area altogether. At least, Rt. 6 from Rt. 29 to Allen Rosd exit is all done.