Road Construction Update August
 
Just announced today from The Illinois Department of Transportation that resurfacing of ramps on Illinois 6 at Knoxville Avenue (Illinois 40) in Peoria and Galena Avenue (Illinois 29) in Mossville begins Sept. 1.
The work will require ramp closures as follows:
 
Sept. 1: The ramp from northbound Illinois 40 to northbound Illinois 6 will close at 7 a.m. for approximately two hours. As work progresses, northbound Illinois 6 past Illinois 40 will close in the afternoon for approximately two hours.
Sept. 2: Southbound Illinois 6 at Illinois 29 will close at 7 a.m. for approximately two hours as resurfacing proceeds on the ramp from Illinois 29 to southbound Illinois 6.
 
The same resurfacing work on Rt 6 from I-74 to Knoxville is almost done, last time I went through there.
 
Other projects:
I-474 WB Bridge near I-74 junction still ongoing. I'm hoping it'll be done by November
McCluggage Bridge WB deck replacement probably won't be done until next year.
In East Peoria, the bridge over Farm.Creek between Veterans and Camp/West Washington has reopened;
Cedar Street bridge reopened last week, only to be reduced to one lane each direction this week for bridge washing;
IL Route 116 still closed near Kickapoo Creek Road for overpass replacement. Not sure the completion date on that;
In Pekin, Court Street between 14th Street and 8th Street still ongoing. I avoid that when I can;
US 24 resurfacing between ICC and Main Street is done. They were getting striping done yesterday;
Route 29 in Creve Coeur had digital signs saying that road work was starting week of August 17, between Wesley Road and Poplar Street; then said week of August 24. Haven't seen even any barrels or cones out yet as of 4:30 pm today;
 
I-74 between Rivian Parkway and I-55 junction is done except for striping.
 
More to come, but feel free to add on anything I might have missed.
Replies:
Message Menu
DennisinPeoria Top Forum Contributor14.8 yrs
~ 15 hrs ago    
Spoke too soon on Rt 29 work. Today NB Right lane was closed with those small vertical barricades up from Poplar Street down the hil almost to Wesley Road. But no crews or equipment yet.
Message Menu
PeoriaIllinoisan Top Forum Contributor19.7 yrs
~ 11 hrs ago    
A few more.... MacArthur Hwy is currently a zig zaging one way going north, and the rest of the south side is one big construction zone. Additionally, Moss Ave is still under construction between Sheridan and University, and the Northmoor - University intersection is still only half open.
DennisinPeoria reacted
Message Menu
DennisinPeoria Top Forum Contributor14.8 yrs
~ 9 hrs ago    
I can't believe I forgot the Flyover bridge from Washington Street to WB I-74 has been closed for about a month, and no idea when it will be done. That was my main way to work.
 
Also, IDOT just announced that Business 24 (McCluggage Road). between regular US 24 and Illinois Rt 8 will have lane and ramp closures for pavement patching and resurfacing starting week of August 31. This is the road that runs by the Menards and Walmart shopping complexes near Washington.